KEBAG ENOVA垃圾能源工厂,瑞士 / Penzel Valier

垃圾能源与光伏发电厂

项目标签

设计公司
Penzel Valier
位置
瑞士
类型
建筑
材料
光伏屋顶石材金属混凝土玻璃
标签
索洛图恩
分类
发电厂工业建筑工厂

感谢Penzel Valier将以下内容授权gooood发行。更多关于他们,请至:Penzel Valier on gooood
Appreciation towards Penzel Valier for providing the following description:

建筑的空间形态由两个关键设计原则塑造。首先,设计团队希望避免原方案可能造成的形态杂乱:原方案拟以肋状结构加固由新旧建筑组成的卸料仓和工艺仓,向上延伸,并以同样的方式继续建设。取而代之的是一个连贯而有力的整体形态,将不同的基础设施构件融为一体。

The spatial form of the building is shaped by two key design principles. First, rather than reinforcing the delivery and process bunkers – comprising both existing and new structures with ribs, extending them vertically, and continuing the new construction in the same manner as originally planned, we sought to avoid the resulting heterogeneity. Instead, our goal was to develop a cohesive and powerful overall form that seamlessly integrates the different infrastructural components.

▼建筑全景,Overall view © Bruno Augsburger

建筑全景,Overall view

▼景观中的厂房,Plant in the landscape © Bruno Augsburger

景观中的厂房,Plant in the landscape

▼厂区入口,Plant entrance © Penzel Valier

厂区入口,Plant entrance

发电厂由两个清晰的部分组成:容纳主要基础设施的坚实基座,以及位于其上的机械设备。这一布局使功能关系更为清晰,也平衡了建筑的整体比例。技术设施坐落于厚重的基座之上,由如同汽车车身般的轻质外壳包覆。一道连续的玻璃带标示出两部分之间的过渡,突出它们的对比,同时让人得以窥见内部壮观的机器大厅。

▼建筑轴测图,Building axonometric © Penzel Valier

建筑轴测图,Building axonometric

The power plant is organized into two distinct elements: a solid plinth that houses the main infrastructure and the machinery positioned above it. This configuration enhances the legibility of functional relationships while balancing the overall proportions. Resting on the massive base, the technical facilities are enclosed in a lightweight shell- akin to the bodywork of a car. A continuous band of glazing marks the transition between these elements, emphasizing their contrast while offering glimpses into the impressive machine hall.

▼卸料入口,Delivery entrance © Bruno Augsburger

卸料入口,Delivery entrance

▼光伏立面与烟囱,Photovoltaic facade and chimney © Bruno Augsburger

光伏立面与烟囱,Photovoltaic facade and chimney

▼悬挑体量与光伏表皮,Cantilever and photovoltaic skin © Bruno Augsburger

悬挑体量与光伏表皮,Cantilever and photovoltaic skin

▼卸料及储存空间,Delivery and storage hall © Bruno Augsburger

卸料及储存空间,Delivery and storage hall

▼吊车与控制室,Crane and control room © Bruno Augsburger

吊车与控制室,Crane and control room

▼抓斗与混凝土仓体,Grab crane and concrete bunker © Bruno Augsburger

抓斗与混凝土仓体,Grab crane and concrete bunker

抓斗细部,Grab crane detail

▼操作室,Operator room © Bruno Augsburger

操作室,Operator room

烟囱从基座中升起,沿工艺大厅一侧向上延伸,总高80米。顶部的观景平台为建筑带来出人意料而鲜明的姿态,形成醒目而独特的细节。

The chimney emerges from the plinth, rising alongside the process hall to a total height of 80 meters. At its peak, a viewing platform introduces an unexpected yet distinctive architectural gesture, giving the structure a striking and unique detail.

▼混凝土体量与烟囱,Concrete volume and chimney © Bruno Augsburger

混凝土体量与烟囱,Concrete volume and chimney

建筑夹缝中的管线,Pipework between volumes

▼竖向空间,Vertical space © Bruno Augsburger

竖向空间,Vertical space

▼楼梯井,Stairwell © Bruno Augsburger

楼梯井,Stairwell

▼楼梯转折,Staircase landing © Bruno Augsburger

楼梯转折,Staircase landing

混凝土楼梯,Concrete staircase

整体体量呈现为一个雕塑般的混凝土实体,将不同功能构件统一于同一种建筑表达之中。在这一雕塑性的框架内,工艺大厅既是功能核心,也是概念核心。生产过程与技术设施在此成为可见的动力,推动着整个厂区运转。因此,在汝拉山南麓开阔的阿勒河沿岸景观中,这座建筑成为一处鲜明而易于辨认的地标。

The volumetric composition takes the form of a sculptural concrete entity, unifying the various functional components into a singular architectural expression. Within this sculptural framework, the process hall serves as both the functional and conceptual epicenter of the complex. Here, the production processes and technological infrastructure become the visible driving force behind the entire facility. As a result, the building asserts itself as a bold and identifiable landmark within the expansive Aare landscape at the southern foothills of the Jura.

▼设备与管线,Equipment and pipework © Penzel Valier

设备与管线,Equipment and pipework

▼生产设施,Process equipment © Penzel Valier

生产设施,Process equipment

▼技术设备空间,Technical equipment space © Bruno Augsburger

技术设备空间,Technical equipment space

▼厂房内部通道,Internal service passage © Bruno Augsburger

厂房内部通道,Internal service passage

▼中央控制室,Central control room © Bruno Augsburger

中央控制室,Central control room

▼环形照明与室内空间,Ring lighting and interior © Bruno Augsburger

环形照明与室内空间,Ring lighting and interior

▼室内天花细部,Interior ceiling detail © Bruno Augsburger

室内天花细部,Interior ceiling detail

▼会议空间,Meeting room © Bruno Augsburger

会议空间,Meeting room

▼办公空间,Office space © Bruno Augsburger

展示区域,Exhibition area

办公空间,Office space

▼室内与远景,Interior and distant landscape © Bruno Augsburger

室内与远景,Interior and distant landscape

▼窗景与装置,Window view and installation © Bruno Augsburger

窗景与装置,Window view and installation

临窗走廊,Window-side corridor

▼夜景,Night view © Bruno Augsburger

夜景,Night view

▼总平面图,Site plan © Penzel Valier

kebag enova 33 drawing 1

▼首层平面图,Ground floor plan © Penzel Valier

首层平面图,Ground floor plan

▼二层平面图,First floor plan © Penzel Valier

二层平面图,First floor plan

▼三层平面图,Second floor plan © Penzel Valier

kebag enova 36 drawing 4

▼四层平面图,Third floor plan © Penzel Valier

kebag enova 37 drawing 5

▼纵剖面A-A,Longitudinal section A-A © Penzel Valier

纵剖面A-A,Longitudinal section A-A

▼横剖面A-A,Cross section A-A © Penzel Valier

横剖面A-A,Cross section A-A

▼纵剖面B-B,Longitudinal section B-B © Penzel Valier

kebag enova 40 drawing 8

▼天然石材嵌饰构造,Natural stone inlay detail © Penzel Valier

天然石材嵌饰构造,Natural stone inlay detail

项目名称 / Project name: KVA Emmenspitz Zuchwil
功能 / Function: 垃圾能源与光伏发电厂 / Waste-to-Energy Plant and Photovoltaic Power Plant
地点 / Location: Emmenspitz, Zuchwil, Switzerland
业主 / Client: Kenova AG
委托 / Commission: 2016年研究方案第一名 / Study, 1st place, 2016
项目设计 / Project planning: 2017年起 / From 2017
开工 / Start of construction: 2020
进驻 / Move-in: 2025
投运 / Commissioning: 2025
完成 / Completion: 2028
SIA 102结构类型与类别 / Type & category of structure according to SIA 102: 技术设施、垃圾能源发电厂 / Technical installations, waste-to-energy plant
SIA 102服务比例 / Performance share according to SIA 102: 建筑服务占比67% / Architecture 67% share of services
建筑面积 / Floor area: 44,000 m²
建筑体积 / Building volume: 约 / Approx. 410,000 m³
建筑设计 / Architecture: Penzel Valier, Zurich
建筑团队 / Architecture team: Apostolos Apostolinas, Leonore Daum, Ecem Dönmez, Timon Dönz, Agnes Eklund, Cait Elliott, Jan Erismann, Liam Gerber, Roland Hasler, Christian Klein, Leo Kleine, Magnus Lidman, Christian Penzel, Heinz Rempfler, Sven Semmisch, Johannes Süssbier, Friedrich Tellbüscher, Martin Valier, Philippe Vaucher, Henning Vogel, Daniel Zielinski
土木工程 / Civil engineering: Penzel Valier, Zurich(方案委托第一名 / Project assignment, 1st place);AFRY Switzerland, Zurich(规划及实施 / Planning and execution)
总体管理及建设 / Overall Management and Construction: TBF + Partner, Zurich
总规划 / General planner: TBF+Partner, Zurich
专项土木工程(建筑、特殊基础、基坑与结构设计)/ Civil engineering (building construction, special foundation engineering, excavation and structural design): AFRY Schweiz, Zurich
光伏设计 / Photovoltaic planning: Sundesign photovoltaic engineering, Stallikon
景观设计 / Landscape architecture: Maurus Schifferli Landschaftsarchitekt, Bern
工艺工程 / Process engineering: TBF+Partner, Zurich
暖通设计 / HVAC planning: Tri Air, Jona SG
给排水设计 / Sanitary planning: Bösch Sanitäringenieure, Dietikon
电气设计 / Electrical planning: Bering, Bern
楼宇自动化 / Building automation: TBF+Partner, Zurich
建筑物理 / Building physics: Gartenmann Engineering, Zurich
安全及消防设计 / Safety and fire protection planning: Hautle Anderegg und Partner, Ostermundigen
交通规划 / Traffic planning: TBF+Partner, Zurich
现场管理 / Site Management: S+B Baumanagement, Pratteln
建筑摄影(供稿项目名单)/ Architectural photography (project credits): Bruno Augsburger, Zurich; Dominic Büttner, Zurich
本篇图片署名 / Image credits in this article: Bruno Augsburger; Penzel Valier
资料来源 / Source: Penzel Valier / v2com
网站 / Website: www.penzelvalier.ch
媒体联系邮箱(Word原稿)/ Media contact email (Word source): pr@penzelvlaier.ch
联系邮箱(PDF资料)/ Contact email (PDF press kit): pr@penzelvalier.ch

More:Penzel Valier 更多关于他们,请至:Penzel Valier on gooood

点击联系该项目/文章的创作/分享者

最新工作+ 提交新工作所有工作 »

发表评论

随机推荐工作 提交工作所有工作 »