2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR: Iona Beach / xwəyeyət Regional Park and WWTP by space2place design inc.

Integrate urban infrastructure with ecological restoration and climate adaptation

项目标签

设计公司
space2place design inc.
位置
Canada
类型
Landscape
标签
RichmondASLABritish Columbia
分类
Industrial Architecture RenovationIndustrial ArchitectureWater Treatment PlantRestoration

“该项目巧妙地将城市基础设施与生态恢复、气候适应和土著文化知识结合在一起,堪称一次变革性的生态改造。项目中运用了多种生态再生策略,通过保护和恢复生态系统,为协调发展与自然迈出了创新的一步,并开辟了一条可持续发展的成功道路,同时为公众提供了一个以经济低调的基础设施,实现重大的生态恢复和气候适应的优秀范例。”

– 2023年ASLA评审委员会评语

“This project beautifully capitalizes on a transformative opportunity to integrate urban infrastructure with ecological restoration, climate adaptation, and Indigenous cultural knowledge. The numerous regenerative approaches layered into the plan are an innovative step towards reconciling development and nature by protecting and reviving the ecosystems and offering a successful model for Indigenous collaboration. Wonderful example of leveraging low profile infrastructure projects to achieve significant ecological restoration and climate adaptation.”

– 2023 Awards Jury

来自 ASLA 对gooood的分享。
Iona Beach / xwəyeyət Regional Park and WWTP|space2place design inc.

 

项目陈述
Project Statement

Iona岛污水处理厂(IIWWTP)与xwəyeyət地区公园堪称大温哥华地区有史以来规模最大的基础设施工程。改造升级后的污水处理厂不仅能够满足联邦法规的要求,同时也为当地创造出一次重要的机会,为当地带来了重大的利益。除了对污水处理厂进行升级外,该项目还致力于恢复河口的动态生态系统,以增加岛屿对气候变化的适应能力,区域公园内的教育和娱乐设施也得到了改善与增强。本项目为当地带来了一次变革性的机会,将城市基础设施与生态恢复和气候适应相结合,为当地创造出了一处意义非凡且可持续的工业遗产。

The Iona Island Wastewater Treatment Plant (IIWWTP) and Regional Park Projects collectively represent the largest capital works project ever undertaken by Metro Vancouver. Driven by the need to upgrade the existing WWTP to meet federal regulations, the projects also offer a critical opportunity to provide significant benefits to the region. In addition to WWTP upgrades, the projects will restore dynamic estuary processes, increase the island’s resilience to climate change and expand educational and recreational offerings in the regional park. These projects are a transformative opportunity to integrate urban infrastructure with ecological restoration and climate adaptation and will create a significant, ongoing legacy for the region.

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲场地规划:概念设计描绘了综合的愿景,除了为污水处理厂进行升级改造外,还将促进公园和社区的整合与生态恢复,Site Plan: The conceptual design describes an integrated vision to upgrade the IIWWTP along with park and community integration and ecological restoration © space2place design inc.

 

项目说明
Project Narrative

加拿大列治文市(Richmond BC)的Iona岛污水处理厂(IIWWTP)是一处人类和生态系统交叉的复杂地点。现有的处理设施位于弗雷泽河河口,是北美西海岸仅进行初级废水处理的最后几家工厂之一,设施的对面则是xʷməθkʷəy̓əm(Musqueam)原住民部落。河口现有的基础设施,包括堤防和防波堤,破坏了自然沉积物和淡水的流动,直接影响了鲑鱼幼体和其他物种的生存。此外,气候变化也对该地区构成了重大的威胁,预计到2100年该地区海平面将上升1米。

对现有的污水处理厂进行必要的升级,以满足联邦对废水排放质量的规定,这是推动本次污水处理厂改造项目的主要动力。然而,此次辅助工程也提供了一次重要的机会,能够为该地区带来重大的利益。本项目的设计概念由一系列相互关联的改造策略构成,包括:污水处理厂升级、资源回收、公园和社区一体化战略,以及生态恢复策略。在生态再生方法的指导下,改造后的污水处理厂不仅能够满足法规要求,甚至能够超越规定的水质处理标准,为周围社区和生态系统做出积极的贡献。

生态改造工程将恢复河口的动态生态系统,增强原生和新生物种的弹性,使众多物种受益。基于生态系统的防洪战略将增强河口地区抵御气候变化影响的能力,并保护新的基础设施。公园和社区的整合策略将在污水处理厂和周围的Iona海滩地区公园之间建立有益的联系。工厂的布局将响应生态敏感地区和社区的愿望,在减少工业基础设施对周围自然环境的视觉影响的情况下,增强当地的教育、娱乐与公园体验设施。

综合设计过程汇集了多学科专业知识,使项目的目标与改善水质、资源回收以及与公园和社区的整合保持一致。在项目初期的定位阶段,就展开了广泛的社会参与,参与者包括与IIWWTP项目相关的各种群体与组织,包括:周围的邻居、公园用户群体、当地政府,以及土著群体。这种协作过程将生态栖息地的恢复、传统资源的获取,以及对xʷməθkʷəy̓əm(Musqueam)原住民文化习俗与民族智慧的宣传,从早期设计阶段就开始整合。这一过程还展示了如何利用跨学科的合作与司法工具开展包容性工作,平衡并整合社会、生态、技术和气候的相关需求。通过持续的综合设计和交付过程,污水处理厂项目的工作将进一步发展和演变,直到2038年,污水处理厂和公园的持续运营将不断改善。

IIWWTP项目是通过保护和恢复人们赖以生存的生态系统和河流环境,为协调发展与自然迈出了创新性的一步。该项目彰显了长远的可持续发展眼光,促进了跨学科合作以及与土著部落的合作,通过以自然为基础的改造策略为该地区创造出重要的、持续的遗产。

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲场地:Iona岛污水处理厂位于弗雷泽河口,是一处人类环境与生态系统交叉的复杂场地,Site: Located in the Fraser River Estuary, the Iona Island Wastewater Treatment Plant occupies a complex site of intersecting human and ecological systems © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲生态环境:弗雷泽河河口和萨利希海为许多物种提供了重要的栖息地,包括:候鸟、鲑鱼和虎鲸,Ecological Context:The Fraser River Estuary and the Salish Sea provide critical habitat for numerous species, including migratory birds, salmon and killer whales © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲Iona岛的自然和工业演变:在过去的一个世纪里,工业活动极大地改变了Iona岛的自然形态和生态,The Physical and Industrial Evolution of Iona Island: Industrial activity has drastically altered the physical form and ecology of Iona Island over the last century © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲当下挑战:弗雷泽河河口基础设施影响了河床沉积物的堆积、以及淡水和水生物的运动,同时气候的变化也对当地造成了重大的威胁,Current Challenges: Infrastructure in the Fraser Estuary has impacted the movement of sediment, freshwater and aquatic species. Climate change also threatens the region © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc whd

▲目标,原则与效益:本项目旨在使污水处理厂满足联邦法规对污水二级处理的监管要求,同时将该设施与公园和周边社区融为一体,Purpose, Principles + Benefits: The IIWWTP Projects aim to meet regulatory requirements for secondary treatment while integrating the WWTP with the park and surrounding communities © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲过程+参与:综合设计过程重点探讨了拟议的污水处理厂升级与生态修复项目之间的相互关联与协同作用,Process + Engagement: An Integrated Design Process focused on exploring interrelated synergies between the proposed IIWWTP upgrades and the ecological restoration projects © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲生态恢复:生态增强策略将恢复河口动态生态系统,增强陆地和淡水生物栖息环境,改善水质,Ecological Restoration: Ecological enhancement strategies will restore dynamic estuary processes, enhance terrestrial and freshwater habitats and improve water quality © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲公园与社区的融合:公园与社区整合的策略使得污水处理厂和周围的Iona海滩地区公园之间形成有意义的关系,Park + Community Integration: Park and community integration strategies allow meaningful relationships to form between the WWTP and the surrounding Iona Beach Regional Park © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲气候适应:气候适应策略包括应对海平面上升,整合技术和生活系统,以及加强和恢复生态系统,Climate Adaptation: Climate adaptation strategies include rising above sea level rise, integrating technical and living systems, and enhancing and restoring ecosystems © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲保护潮间带沼泽的处理计划:污水处理厂升级工程将显著改善排放到萨利希海中的污水质量,提升资源回收效率与气味控制,Treatment Plan Sited to Protect Intertidal Marsh: The proposed WWTP upgrades will significantly improve the effluent quality received by the Salish Sea, along with resource recovery and odour control © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲淡水湿地与北岸防洪堤决口相结合:高质量的再生废水将用于灌溉、商业用途和生态系统恢复,包括为淡水湿地补充水源,Freshwater Wetlands Integrated with North Arm Jetty Breach: High-quality reclaimed effluent will be used for irrigation, commercial use, and ecosystem restoration, including recharging the freshwater wetlands © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲恢复河口淡水流量:堤道和北防波堤决口将重新建立弗雷泽河北岸和防波堤间区域之间的联系,Freshwater Flow to the Estuary Restored: The causeway and North jetty dike breaches will re-establish connections between the North Arm of the Fraser River and the inter-jetty area © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲接待中心与公园景观相结合:接待中心将举办一系列与公园相关的活动,容纳保护组织,提供科普性展览, 创造出展示Musqueam文化的机会,Welcome Centre Integrated with Park Landscape: The Welcome Centre will host park programs, conservation organizations, interpretive displays and provide an opportunity to showcase Musqueam culture © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc

▲污泥泻湖转变为生物多样性环境:步道和观景台将与湿地和潮汐沼泽相结合,提供娱乐和教育机会,Sludge Lagoons Transformed into a Biodiverse Environment: Pedestrian trails and lookout points will be integrated with wetlands and tidal marshes, providing recreational and educational opportunities © space2place design inc.

 

2023 ASLA ANALYSIS AND PLANNING AWARD OF HONOR Iona Beach xweyeyet Regional park and WWTP by space2place design inc isb

▲不同栖息地的生态系统再生:有生命的防波堤、沉积物的累积,以及潮汐栖息地的再生将恢复前海岸的生态,并使滨鸟、贝类和鲑鱼幼体受益,Ecosystem Regeneration of Diverse Habitats: Living breakwaters, sediment placement and tidal habitat creation will restore the foreshore and benefit shorebirds, shellfish and juvenile salmon © space2place design inc.

 

Project Narrative

The Iona Island Wastewater Treatment Plant (IIWWTP) in Richmond, BC sits on xʷəyeyət/Iona Island, a complex site of intersecting human and ecological systems. Located in the Fraser River Estuary and across from xʷməθkʷəy̓əm/Musqueam, the existing treatment facility is one of the last plants on North America’s west coast with only primary level wastewater treatment. Existing infrastructure in the estuary, including dikes and jetties, has disrupted natural sediment and freshwater flows, directly impacting juvenile salmon and other species. Furthermore, climate change poses a significant threat to the region, with projections estimating one metre of sea level rise by 2100.

Required upgrades to the existing IIWWTP to meet federal regulations for wastewater effluent quality are the primary force driving the IIWWTP Projects. Yet, the ancillary works also offer a critical opportunity to provide significant benefits to the region. The conceptual design of the IIWWTP Projects has been developed as a portfolio of interrelated undertakings, including wastewater treatment plant upgrades, resource recovery initiatives, park and community integration strategies and ecological restoration projects. Guided by a regenerative approach, these projects will upgrade the existing plant to not only meet, but exceed, water quality treatment regulations, while making a net positive contribution to the surrounding communities and ecosystems.

Ecological projects will restore dynamic estuary processes and enhance native and novel habitats to benefit numerous species. Ecosystem-based flood protection strategies will increase resilience against climate change impacts and protect new infrastructure. Park and community integration strategies will enable meaningful relationships between the IIWWTP and the surrounding Iona Beach Regional Park. The strategies will ensure that the plant’s layout responds to ecologically sensitive areas and the community’s desire to minimize its visual impact, while expanding educational, recreational, and experiential park offerings.

An integrated design process brought together multi-disciplinary expertise to align the project’s goals of improving water quality, resource recovery, and integration with the park and community. Throughout the project definition phase, an extensive engagement process was undertaken to work with a variety of organizations impacted by the IIWWTP Projects, including neighbours, park user groups, local government, and Indigenous groups. This collaborative process has enabled priorities such as habitat restoration, traditional resource access, and recognition of xʷməθkʷəy̓əm/Musqueam cultural practices and knowledge transfer to be integrated from early design stages.

This process also demonstrated how to work inclusively across disciplines and jurisdictions to balance and integrate social, ecological, technical, and climate-related needs. Through the continuation of an integrated design and delivery process, work on the IIWWTP Projects will further develop and evolve until 2038, and continual improvement will be achieved through ongoing WWTP and park operations.

The IIWWTP Projects are an innovative step towards reconciling development and nature by protecting and reviving the ecosystems and flows that sustain us. These projects inspire a vision for interdisciplinary and Indigenous collaboration and nature-based solutions with the potential to establish a significant, ongoing legacy for the region.

More:ASLAspace2place design inc.

点击联系该项目/文章的创作/分享者

Latest jobs+ Post a jobAll jobs »

发表评论

1 评论

  1. 染净识

    图纸好看
    DK

Featured jobs Post a jobAll jobs »