Terra project - A Silver Lining, Limassol by Orange Architects

Gentle, sophisticated, light and natural, a 360 degrees open and fluent apartment.

项目标签

设计公司
Orange Architects
位置
Cyprus
类型
Architecture
材料
Glass
标签
Limassol
分类
Coastal ArchitectureResidential ArchitectureApartment BuildingsResidential Apartment

来自Orange Architects对gooood的分享。更多关于:Orange Architects on gooood。
Appreciation towards Orange Architects for providing the following description:

Orange建筑事务所赢得了Terra竞赛项目。由Masharii & The Land委托设计的高级奢华公寓楼位于塞浦路斯利马索尔的海滩。此项目包含10户奢华公寓,坐落于利马索尔海岸边双层高的底商顶部,其底商尤其适合开餐厅和夜店。Orange建筑事务所专注于在此休闲娱乐的海滩区域设计一个优雅又独特的塔楼,靠近大海和城市中的度假娱乐区。设计概念旨在将一系列独特的小别墅一个个错落的堆叠在一起。让每一层都能有一户奢华公寓。设计师为了提升居住体验,将每层的平面都布置的开放流动,用户得以欣赏这里360度的优美全景。

Orange Architects wins the closed competition for Terra Project; An exclusive residential tower at the beach in Limassol, Cyprus – commissioned by Masharii & The Land.The design for the Terra project consists of 10 luxurious apartments, on top of a double high commercial plinth – ultimately suitable for a nice club or restaurant – on the shore line of Limassol, Cyprus. With the design Orange Architects focuses on blending in an elegant and unique tower, in a recreational beach area, close to the sea and part of the holiday entertainment zone of the city. The concept consists of a set of completely unique stacked villas on top of each other. On every floor one luxurious apartment is realized. To fully enhance the living experience on this scenic location a 360 degrees open and fluent panoramic floorplan on every level is proposed.

▼一系列独特的小别墅一个个错落的堆叠在一起,a set of completely unique stacked villas on top of each other

OrangeArchitects_Terra project_02

为了优化这一概念,Orange建筑事务所设计的结构方案将立面的承重元件取消,只保留从建筑核心筒伸出的悬臂梁和楼板。每层都独享错落相间布置的私人泳池,花园和宽敞的露台,所有楼层的形状都独一无二,像一系列水平方向的云。在横向结构楼板之间的玻璃立面可以完全敞开,公寓因此成为一个“室内的室外”空间,也更加方便通往私人泳池,花园和露台。

▼每层都独享错落相间布置的私人泳池,花园和宽敞的露台,所有楼层的形状都独一无二,像一系列水平方向的云,
By adding a private swimming pool, a small garden and a generous terrace in different positions to the standard plan on every floor, all floors are shaped into unique forms, like a set of horizontal clouds

OrangeArchitects_Terra project_01

建筑师通过增高或降低公寓内不同区域的层高来区别并最大化每个不同空间的高度,以适应公寓内各个空间功能的不同需求。最终每一户公寓中都包含至少一个净高5.2米的通高空间,悬挂以一个夹层。公寓连贯宽敞,饱览全景的各个空间都由其高度区分。在建筑用材方面,Oranger建筑事务所专注于将利马索尔的“海滩文化”表现出来。白色曲面立面创造出一种柔和精美,轻盈自然的的效果,同时将各个天空公寓的个性清晰的表达出来。全透明玻璃立面可以全部打开如同玻璃幕墙,当推拉门敞开式公寓便充斥着夏日的海滩风情。

▼全透明玻璃立面可以全部打开如同玻璃幕墙,当推拉门敞开式公寓便充斥着夏日的海滩风情,Windows are fully glazed and fully openable as curtain walls, sliding to the sides for optimal summer feeling.

OrangeArchitects_Terra project_03

OrangeArchitects_Terra project_04

To maximize this concept Orange Architects designed a structural scheme with no load bearing elements in the façade line, but only cantilevering beams and floorplates sticking out from the core. By adding a private swimming pool, a small garden and a generous terrace in different positions to the standard plan on every floor, all floors are shaped into unique forms, like a set of horizontal clouds. The glazed facades in between the structural horizontal plates can be fully opened, transforming the apartment into an ‘indoor-outside’ space, with direct accessibility to the private pool, garden or terrace.

By stepping up and down different zones in every apartment it is possible to differentiate and maximize the heights on every floor; fitting with the various spaces and functions of the apartments. As a result all apartments have at least one double high space, up to 5,2 meter net, with a split level or a mezzanine floor hanging in. Thus the interior of the apartments is dominated by its panoramic, all around space, and differentiated by its various height levels.

In the materialization of the building Orange Architects aims on blending in with the ‘beach culture’ of Limassol. The white curved façades create an optimistic, gentle, sophisticated, light and natural appearance that clearly shows the unique plasticity of the different sky villas. Windows are fully glazed and fully openable as curtain walls, sliding to the sides for optimal summer feeling.

▼分析图,Diagram

OrangeArchitects_Terra project_typology

▼形体分析图,Formation Diagram

OrangeArchitects_Terra project_concept schemes

▼平面图,Floor Plan

Projectnaam

▼剖面图,Section

O018-161108-Section

More: Orange Architects,更多关于:Orange Architects on gooood。

点击联系该项目/文章的创作/分享者

Latest jobs+ Post a jobAll jobs »

发表评论

13 评论

  1. 行者

    范斯沃斯住宅知道吗,简约大玻璃,后来建筑师密斯被业主投诉,哈哈,很无奈,,效果图做的美炸了,

  2. 为梦而追逐.轩

    效果图6

  3. 丶Idi

    水池的沉重是个problem

  4. 卢西尼奥

    这个建筑的结构工程师会发疯吧。

  5. 卢西尼奥

    效果图做的好····

  6. R.柱

    很棒的设计

  7. Mosam

    好烦,为什么我没有一套

    1. SALA

      好烦,有好几套不知道住那套

    2. 高卫

      一套什么?

    3. Dream boy

      有同感

    4. 那位,不是我

      这个逼清新脱俗,

    5. 龙眼

      我们公司的产品哦,现在已经开始发售了

    6. 行者

      真有人买啊,

Featured jobs Post a jobAll jobs »