Secondary school, Vouvry by Berrel Berrel Krautler AG

Shimmering secondary school with an envelope of welted brass sheets houses a triple sports hall under its roof in the centre.

项目标签

设计公司
Berrel Berrel Krautler AG
位置
Switzerland
类型
Architecture
材料
BrassGlass
标签
VouvrySkylight
分类
Middle SchoolEducational Architecture

来自 Berrel Berrel Krautler AG 对gooood的分享。更多关于:Berrel Berrel Krautler AG on gooood.
Appreciation towards Berrel Berrel Krautler AG  for providing the following description:

Vouvry’s golden中学闪闪发光的矗立在罗讷河和下瓦莱州的谷底中心村之间。建筑的尺度和外形时时刻刻让人回想起山谷里曾经的工业建筑。这栋紧凑的三层建筑,地面层回缩,在屋顶中央下方是一个三层的体育馆,体育馆周边的房间和各个入口以风车的形式排列布局。贴边黄铜板的外表皮包围着建筑,外表皮采用了传统的加工工艺,打破了建筑大的形体感,地面层回缩,二三层四面向外扩展出八米,提供了集会的空间。

Vouvry’s golden, shimmering secondary school stands between the River Rhone and the village centre on the valley floor of the Lower Valais. Its dimensions and form recall the industrial buildings that have been constructed in the valley. The three-story, compact building with a retracted ground floor houses a triple sports hall under its roof in the centre, around which all rooms and accessing are grouped in a windmill arrangement. An envelope of welted brass sheets covers the secondary school. The traditional processing technique for the façade breaks down the large form of the building, as does the recessed ground floor, above which the two upper levels project eight meters outwards on all sides to provide a covered gathering space.

▼ 紧凑的三层建筑,地面层回缩,The three-story, compact building with a retracted ground floor

1-Secondary school Vouvry by Berrel Berrel Krautler AG

2-Secondary school Vouvry by Berrel Berrel Krautler AG

▼ 贴边黄铜板的外表皮包围着建筑,An envelope of welted brass sheets covers the secondary school.

4-Secondary school Vouvry by Berrel Berrel Krautler AG    5-Secondary school Vouvry by Berrel Berrel Krautler AG

▼ 二三层四面向外扩展出八米提供了集会的空间,two upper levels project eight meters outwards on all sides to provide a covered gathering space.

6-Secondary school Vouvry by Berrel Berrel Krautler AG

学生和老师从建筑西边和东边角落的入口进入建筑,建筑的整个侧面由层层跌落的台阶铺满开来,引导人们拾级而上。从顶部看去,体育馆的四壁都由玻璃建造而成,为内部提供了景观。顶层的天窗使日光倾洒进建筑的内部。

Pupils and teachers enter the building from one of two corner entrances on the east and west sides. Cascade stairs, each of which cover the entire breadth of the lateral sides, lead to the upper levels. There is a surprise at the top: Here the walls of the sports hall are made of glass, allowing views straight through the storey and into the hall. Skylights allow daylight to reach the building’s centre and the top floor.

▼ 在屋顶中央下方是一个三层的体育馆,a triple sports hall under its roof in the centre

8-Secondary school Vouvry by Berrel Berrel Krautler AG

16-Secondary school Vouvry by Berrel Berrel Krautler AG

17-Secondary school Vouvry by Berrel Berrel Krautler AG

▼ 体育馆的四壁都由玻璃建造而成,the walls of the sports hall are made of glass

[//one_one]

9-Secondary school Vouvry by Berrel Berrel Krautler AG

7-Secondary school Vouvry by Berrel Berrel Krautler AG

▼ 顶层的天窗使日光倾洒进建筑的内部,Skylights allow daylight to reach the building’s centre and the top floor

11-Secondary school Vouvry by Berrel Berrel Krautler AG

19-Secondary school Vouvry by Berrel Berrel Krautler AG    20-Secondary school Vouvry by Berrel Berrel Krautler AG

公共休息室和走廊的墙壁与地板刷涂成酒红色,与白色的体育馆和由白色镶板铺满的教室形成鲜明的对比。

The walls and floors of the common rooms and corridors are painted in a wine-red colour. They contrast with the white sports hall and the classrooms, which are clad in white panelling.

13-Secondary school Vouvry by Berrel Berrel Krautler AG

15-Secondary school Vouvry by Berrel Berrel Krautler AG

12-Secondary school Vouvry by Berrel Berrel Krautler AG

承重结果的概念基于巨型结构,三层教室的分隔墙成为了支持结构。二层犹如一个木建筑悬吊于三层。

The load-bearing concept is based on a megastructure. The partition walls of the classrooms on the second upper level form a supporting structure. The first upper level is suspended onto it as a timber construction.

▼ 教室,Classroom

23-Secondary school Vouvry by Berrel Berrel Krautler AG

26-Secondary school Vouvry by Berrel Berrel Krautler AG

28-Secondary school Vouvry by Berrel Berrel Krautler AG    29-Secondary school Vouvry by Berrel Berrel Krautler AG

30-Secondary school Vouvry by Berrel Berrel Krautler AG

▼ 卫生间,Restroom

32-Secondary school Vouvry by Berrel Berrel Krautler AG

▼ 地面层平面图四边回缩八米,Recessed Ground Floor Plans

33-Secondary school Vouvry by Berrel Berrel Krautler AG

▼ 平面图,Floor Plans

34-Secondary school Vouvry by Berrel Berrel Krautler AG   35-Secondary school Vouvry by Berrel Berrel Krautler AG

▼ 剖面图,Section

37-Secondary school Vouvry by Berrel Berrel Krautler AG

▼ 立面图,Elevation

36-Secondary school Vouvry by Berrel Berrel Krautler AG

Competition: 2008
Project years: 2010-2013
Construction costs: 26.7 Mio. CHF
Gross floor area: 9400 m2
Building volume: 52’000 m3

Credits
Civil engineer: Ulaga Partner AG / ESM group
Landscape architect: asp Landschaftsarchitekten AG
Signage: Dominique Berrel
Photographs: Eik Frenzel / Radek Brunecky

More:  Berrel Berrel Krautler AG,更多关于:Berrel Berrel Krautler AG on gooood.

点击联系该项目/文章的创作/分享者

Latest jobs+ Post a jobAll jobs »

发表评论

2 评论

  1. 佳音

    这要是有班级上体育课,别的班还能专心上别的课么·········

  2. 子小点友

    在里面打球一定不舒服,会亮瞎眼睛的的的的的的的……

Featured jobs Post a jobAll jobs »